Retro-Commissioning Services
Optimizing Existing Facilities’ System Performance
Retro‐commissioning is the systematic process of investigating, analyzing, & optimizing an existing facility’s system performance through operational & maintenance improvement to ensure optimal performance as designed over time.
This process tailors the building to meet the design intent & your current facility requirements. We achieve this by comparing your building system’s as‐built documents against the actual operational performance of your building systems. We identify & document non-compliance operating conditions in your building & provide a report with recommendations & a path towards improvement.
Typical Existing Building Problem Areas:
- Building automation controls point mapping and reporting issues.
- HVAC equipment installation issues.
- Missing specified HVAC equipment and components.
- Non-operating AHU economizers, incorrectly programmed VFDs, and incorrect control point applications and operational sequence algorithms.