Warehouse and distribution facilities ranging from 400,000 – 1,500,000 sq. ft.; projects included 44,000 sq. ft. hazardous storage areas
MEP engineering services for 180,000 sq. ft. poultry processing plant | MEP engineering services for 180,000 sq. ft. poultry processing plant.
Cargo and warehouse facility totaling 80,000 sq. ft.; including 70,000 sq. ft. of warehouse space and 6,000 sq. ft. of office space | Cargo and
We provided MEP design services for the interior build-out of a new manufacturing facility specializing in advanced composite products for the aerospace and defense industry
150,000 sq. ft. refrigerated and frozen storage facility with 20,000 sq. ft. of office space for McDonald’s Restaurants | 150,000 sq. ft. refrigerated and frozen
170,000 sq. ft. office and beverage warehouse facility with 14,000 sq. ft. of office and 40,000 sq. ft. of refrigerated storage | 170,000 sq. ft.
We provided design services for a state-of-the-art 128,000 square foot printing facility. Systems included a chiller water plant, 100% air conditioned printing areas with humidity
MEP design services for a 194,000 sq. ft. warehouse, 47,000 sq. ft. office space and 31,000 sq. ft. parking garage for a credit card machine
61,000 sq. ft. warehouse renovation and a 52,000 sq. ft. conditioned manufacturing expansion (The project is registered with goal of LEED Certification) | 61,000 sq.
220,000 sq. ft. bulk warehouse; also providing energy cost modeling and fundamental commissioning (The project achieved LEED CS v2.0 Silver certification) | 220,000 sq. ft.
440,000 sq. ft. bulk warehouse; also providing energy cost modeling and fundamental commissioning (The project achieved LEED CS v2.0 Silver certification) | 440,000 sq. ft.
MEP engineering services for a promotional/marketing supplies manufacturer; project included a 100,000 sq. ft. warehouse with 40,000 sq. ft. of office space and 50,000 sq.
MEP design services for distribution center shell, 546,000 square feet | MEP design services for distribution center shell, 546,000 square feet.
MEP design services for a 280,000 sq. ft. warehouse and distribution center | MEP design services for a 280,000 sq. ft. warehouse and distribution center.
MEP design services for five shell distribution/warehouse buildings, 390,500 square feet | MEP design services for five shell distribution/warehouse buildings, 390,500 square feet.
115,400 sq. ft. warehouse facilities with 12,000 sq. ft. of office space each | 115,400 sq. ft. warehouse facilities with 12,000 sq. ft. of office
We provided MEP engineering services for the interior build-out of a 60,000 sq. ft. manufacturing facility specializing in adhesives, abrasives, die-cutting and specialty labels. The
7,000 sq. ft. renovations of an existing office warehouse | 7,000 sq. ft. renovations of an existing office warehouse.
350,000 sq. ft. distribution warehouse | 350,000 sq. ft. distribution warehouse .
We provided design services for a 294,000 square foot automotive parts manufacturing and assembly plant. Plant provides injection-molded plastic parts for the adjacent Mercedes- Benz
Storage and distribution center, 524,000 square feet | Storage and distribution center, 524,000 square feet.
130,000 sq. ft. single-story heated and ventilated warehouse facility | 130,000 sq. ft. single-story heated and ventilated warehouse facility.
Three single-story heated and ventilated warehouse facilities ranging in size from 45,000 sq. ft. to 125,000 sq. ft.; two with office space | Three single-story
MEP design services for a 600,000 sq. ft. office / warehouse facility | MEP design services for a 600,000 sq. ft. office / warehouse facility.
190,000 sq. ft. warehouse and a 30,000 sq. ft. office space / support areas; also provided a 30,000 sq. ft. addition to the warehouse |
Prototype design and reuse for 900,000 sq. ft. conditioned warehouse and distribution centers with multi-level pick modules and conveyor systems; projects included aerosol storage and
Storage and distribution center, 53,000 square feet (The project achieved LEED NC v2.2 Silver certification) | Storage and distribution center, 53,000 square feet. (The project
A food processing plant that consists of approximately 13,000 sq. ft. of refrigerated processing space. The design included the refrigeration systems necessary to keep the
We provided MEP engineering services for renovations and additions to an existing manufacturing facility specializing in flexible and specialty rigid packaging; areas included front office
380,000 sq. ft. parts distribution warehouses with approximately 40,000 sq. ft. general office space | 380,000 sq. ft. parts distribution warehouses with approximately 40,000 sq.
380,000 sq. ft. office/warehouse facility with 40,000 square feet of office and 40,000 square feet of refrigerated storage | 380,000 sq. ft. office/warehouse facility with
27,000 sq. ft. assembly and storage warehouse with a two story, 14,000 sq. ft. office and testing area | 27,000 sq. ft. assembly and storage
We provided MEP design services for a 160,000 sq. ft. plastics molding facility. Systems included a chiller water plant, process piping to process equipment, 100%
We provided MEP design services for a 300,000 sq. ft. plastics molding facility. Systems included a chiller water plant, process piping to process equipment, 100%
Warehouse and distribution facilities ranging from 400,000 – 1,500,000 sq. ft.; projects included 44,000 sq. ft. hazardous storage areas
We provided MEP design services for a 150,000 sq. ft. electronic circuit board assembly plant. Design included a chilled water central plant, compressed air and
240,000 sq. ft. distribution warehouse with approximately 3,000 sq. ft. office and conference space | 240,000 sq. ft. distribution warehouse with approximately 3,000 sq. ft.
Single-story, 377,250 sq. ft. manufacturing / distribution facility with 50,000 sq. ft. of office space; conditioned warehouse space includes provisioning office, ground support office and
A three (3) story eyeglass manufacturing and distribution facility with approximately 150,000 sq. ft. of manufacturing space. The manufacturing space was fully conditioned and the
MEP services for an additional 10,000 sq. ft warehouse, 2,650 sq. ft. office, 2,500 sq. ft. covered garage and a survey of the existing building
MEP services for a 170,000 sq. ft. Logistics and Distribution Center.
Mechanical and electrical engineering services for shell and tenant upgrades of a single- story 122,000 sq. ft. building including mailroom, facility engineering, warehouse and office/supply
Conversion of hydronic heating and domestic hot water generation from a central steam plant to decentralized natural gas boiler systems for nine (9) existing buildings,